Rowantree Consultation Layout 1.
Click here to download a pdf file of layout 1.
This initial layout for Rowantree is a design optimised from a technology perspective. The factors taken into account are:
- general wind flow within the area
- wind flow across the site
- site topography in relation to wind flow
- steepness of slope in terms of placing turbines on the site
- optimum energy capture and consequently energy yield.
The next stage in the design process will be to apply the environmental constraints identified as a result of the studies currently being undertaken. This will include cultural heritage, ornithology, ecology, hydrology, geology and access. These elements will be fed into Consultation Layout 2.
If you have any comments about this layout please email

