Site statistics
| Catchment area | 16.1km2 |
| Head | 196m |
| Max abstraction rate | 1.955m3/sec |
| Installed capacity of scheme | 2.0-2.7MW |
| No. of average homes supplied equivalent to project generation | 1500 householdsFN |
Footnote
Energy predicted to be generated by the scheme is derived using available flows monitored at the site and applying trends from RWE npower renewables' existing hydro portfolio located across the UK and the predicted station efficiency.
Equivalent homes supplied is based on an annual electricity consumption per home of 4700 kWh. This figure is supported by recent domestic electricity consumption data available from The Digest of UK Energy Statistics and household estimates and projections from the UK Statistics Authority.

