Site statistics
| Installed capacity of project | 50 megawatts. |
| Operational | 2012. |
| Environmental benefits | Removal of 250,000 tonnes of fossil fuel CO2 annually. |
| Biomass requirements of CHP plant | Around 440,000 tonnes per annum. |
| Technology of new power plant | Steam will be raised in a single Metso circulating fluidizedbed (CFB) boiler and supplied to a Siemens extraction / condensing steam turbine. An air cooled condenser will provide cooling to the CHP plant. |
| Location | Markinch, near Glenrothes, Fife inScotland. |

