Draft Environmental Statement (ES)
INFORMATION AND CONTENTS
On this page you will find an electronic file version of the Clocaenog Forest Wind Farm Draft Environmental Statement (ES).
This is a very large and detailed technical document and is available in English only. The Non Technical Statement summarising the ES is available in English and Welsh.
Because of the size of the entire document, the ES has been split into smaller files so that it is quicker and easier for you to download and view the specific sections that you are interested in.
Access the ES chapters
This page provides a series of hyperlinks to the various Chapters of the ES document. Each chapter is a separate file, available to download as a PDF.
Seperate links to Annexes
Some chapters have Annexes to accompany them and you can access these seperately by using the “Annexes” link on this page.
CONTENTS
Chapters:
1. Introduction
(PDF | 1.4 MB)
2. Scheme Description
(PDF | 2.2 MB)
3. Siting and Design
(PDF | 31.9 MB)
4. Planning and Policy
(PDF | 119 KB)
5. Landscape and Visual
(PDF | 0.5 MB)
6. Cultural Heritage
(PDF | 26.4 MB)
7. Landuse & Forestry
(PDF | 2.7 MB)
8. Hydrology & Geology
(PDF | 5.4 MB)
9. Ecology Non-Avian
(PDF | 0.4 MB)
10. Ecology Avian
(PDF | 0.6 MB)
11. Noise
(PDF | 3.3 MB)
12. Traffic & Transportation
(PDF | 1.8 MB)
13. Telecoms, Aviation & Shadow Flicker
(PDF | 5 MB)
14. Socio-Economics & Tourism
(PDF | 1.1 MB)
15. Grid
(PDF | 3.6 MB)
16. Glossary
(PDF | 100 KB)

