Non-usability generation

Planned and unplanned non-usability

This information is based on the regulation of the European Commission No.543/2013, Art. 15.1.a/b/d, 15.2, 15.3) and contains both planned and unscheduled non-usabilities for generation units of any size with generation reductions of at least 10 MW and 30 minutes duration. The displayed period is adjustable by using the integrated calendar function within the last two and following two years. However, the available data starts accordingly to the European data platformEMFIP(Electricity Market Fundamental Information Platform) at 01.01.2015 and the displayed period is limited to seven days for reasons of clarity.

All data is updated as soon as possible according to present knowledge. The data history is available by clicking on the corresponding non-usability number.

All non-usability messages of the last 24 hours are available as RSS-feed too.

{{'POWER_PLAN_DATE_OF_EVENT' | translate}}

{{'POWER_PLAN_FROM_DATE' | translate}}

{{'POWER_PLAN_TO_DATE' | translate}}

{{'POWER_PLAN_UNIT' | translate}} {{'POWER_PLAN_FUEL_TYPE' | translate}} {{'POWER_PLAN_EVENT_TYPE' | translate}} {{'POWER_PLAN_START' | translate}} {{'POWER_PLAN_UNTIL' | translate}} {{'POWER_PLAN_RED_CAP' | translate}} {{'POWER_PLAN_CAUSE' | translate}} {{'POWER_PLAN_CHANGE_DATE' | translate}} {{'POWER_PLAN_EVENT_ID' | translate}} {{'POWER_PLAN_STATUS' | translate}}
{{data.FuelType | filterFuelType:languageValue}} {{data.EvType | filterEventType:languageValue}} {{data.From | filterToLocalDate:languageValue}} {{data.Until | filterToLocalDate:languageValue}} {{data.Cause | filterCause:languageValue}} {{data.ChangeDate | filterToLocalDate:languageValue}} {{data.Status | filterEventStatus:languageValue}}