Your settings for cookies and pixels on rwe.com

Select which cookies and pixels we are allowed to use. Please note that some cookies are necessary for technical reasons and must be enabled in order to maintain the functionality of our website. If you would like to benefit from every service on our website, please consider that you need to choose every cookie category. For more information, please refer to our Privacy Policy.

    • Maintain the stability of the website.
    • Save your log-in data.
    • Allow to improve the user experience.
    • They provide advertisements that are relevant to your interests.
    • They allow you to share interesting content directly with your social media network.

You can change your cookie and pixel settings on rwe.com at any time via our Privacy Policy.

Imprint

Show Details
Select all Confirm selection
RWE Image
STA02-greenhouse-gas-reduction-in-mining-sector

Residual gas utilization

Bankable Feasibility for CHP

Client

Tata Steel

Location

United Kingdom

Expertise

Feasibility Study, CHP, Emission Reduction

 

Iron and steel production is very carbon intense. Tata Steel's Port Talbot plant, using a blast furnace-basic oxygen furnace route (BF-BOF) operates very efficiently within the constraints of its existing technology, however, further efficiency gains are limited without a major step change in technology.

Tata Steel planned to construct a 2 x 70MW blast furnace gas-fired CHP located at the Port Talbot site. A key focus of the plant design was to assure reliable and constant steam supply for steel production facilities. The bankable feasibility study was carried out by RWE for Inside Station Battery Limit (ISBL) scope including thermal engineering design, assumptions book, project execution plan, site evaluation report and project management plan.

Our study report enabled the Tata Steel board to make an informed investment decision. Tata Steel has invested more than £1.6 billion since 2007 to upgrade plant and technology at its UK operations, improve efficiency and reduce emissions, including:

  • Basic oxygen steelmaking (BOS) gas recovery (reused for other processes) 
  • Increased use of coal injection to replace coke use in furnace 
  • Hot linking where possible (to reduce heat loss) 
  • Recuperation and regeneration (heat recovery from reheating furnaces) 
  • Variable speed drives for motors (20-30 % energy savings for motors) 
  • Studies have been undertaken for upgrading of on-site, blast furnace-gas fueled power stations at a cost (without CCS) of several hundred million pounds

Our Services

  • Bankable Feasibility Study Report 
  • Review of existing project documents
  • Elaboration of Framework Specification 
  • Site Survey / Inspection 
  • Process Engineering/Systems Engineering 
  • Financial Modelling 
  • Risk Assessments 
  • Project Management 
  • Project Execution Planning